System Log
Application Information

Application Number: BP-20250111-0001

Status: Draft

Last Saved: Not yet saved

Building Permit Application

Complete the form below to apply for a building permit

1
Applicant Info
2
Property Details
3
Project Info
4
Professionals
5
Requirements
6
Review & Submit

Applicant Information

Please enter last name
Please enter first name
Please enter a valid email
Format: 09XX-XXX-XXXX
Please enter complete address
Format: XXX-XXX-XXX-XXX
Please select applicant type

Property Details

Please enter lot number
Please enter property address
Please enter barangay
Please enter city
Please enter province
Please enter TCT/OCT number
Please enter lot area

Project Information

Please select project type
Please select building use
Please enter number of storeys
Please enter floor area
Please enter estimated cost
Please enter project description
Please enter start date
Please enter completion date

Design Professionals

Architect
Please enter architect name
6-7 digit number required
Civil/Structural Engineer
Please enter engineer name
6-7 digit number required
Electrical Engineer
Please enter electrical engineer name
6-7 digit number required
Sanitary/Plumbing Engineer
Please enter plumbing engineer name
6-7 digit number required

Requirements Checklist

Please check all documents that you have prepared:

Review and Submit

Please review your application details before submitting.
Digital Signature

Please sign below to certify that all information provided is true and correct.

You must agree before submitting

Building Permit Fee Calculator

Calculate estimated fees for your building permit

Application Status Tracker

Track your building permit application status

Complete Requirements Checklist

23 Requirements across 11 Categories - PD 1096 Compliant

Progress Overview
0/23
1. Land Use & Zoning (4 Requirements)
2. Line & Grade (1 Requirement)
3. Architectural Plans (3 Requirements)
4. Structural Plans (3 Requirements)
5. Sanitary/Plumbing (2 Requirements)
6. Electrical Plans (2 Requirements)
7. Mechanical (1 Requirement)
8. Fire & Safety (2 Requirements)
9. Environmental (1 Requirement)
10. Community Clearances (1 Requirement)
11. Professional Documents (3 Requirements)

Building Permit Process Guide

Step-by-step guide to obtaining your building permit

1

Pre-Application Preparation

Gather all necessary documents and requirements before submitting your application.

  • Secure property title documents (TCT/OCT)
  • Obtain tax declaration from Assessor's Office
  • Get barangay clearance
  • Prepare vicinity map and location plan

Timeline: 1-2 weeks

2

Hire Licensed Professionals

Engage qualified professionals to prepare your building plans.

  • Licensed Architect for architectural plans
  • Licensed Civil/Structural Engineer
  • Licensed Electrical Engineer
  • Licensed Sanitary/Plumbing Engineer

Timeline: 2-4 weeks

3

Prepare Building Plans

Complete all required plans with proper signatures and seals.

  • Architectural plans (5 sets minimum)
  • Structural plans (5 sets)
  • Electrical plans (5 sets)
  • Sanitary/Plumbing plans (5 sets)

Timeline: 4-8 weeks

4

Submit Application

Submit your complete application to the Building Official's Office.

  • Fill out building permit application form
  • Submit all required documents
  • Pay filing fees
  • Receive application number

Timeline: 1 day

5

Plan Review & Evaluation

Building Official reviews and evaluates your submitted plans.

  • Plans checking for compliance with National Building Code
  • Review of structural integrity
  • Fire safety evaluation
  • Zoning compliance check

Timeline: 20-30 working days

6

Fee Assessment & Payment

Pay all required fees after approval of plans.

  • Building permit fee
  • Electrical permit fee
  • Plumbing permit fee
  • Processing and documentary stamp fees

Timeline: 1-2 days

7

Permit Issuance & Release

Claim your approved building permit and begin construction.

  • Receive official building permit
  • Post permit at construction site
  • Schedule required inspections
  • Begin construction within permit validity

Timeline: 3-5 days

Total Processing Time

Average: 10-15 weeks from start to permit release (including plan preparation)

Forms & Templates Library

Complete collection of NBC forms and supporting documents for building permit applications

I. Primary Application Forms

NBC Form B-01

Unified Building Permit Application

Available

II. Ancillary Permits (NBC A-Series)

Required: All ancillary permits must be submitted with the building permit application

NBC Form A-01

Architectural Permit

Contact LGU
NBC Form A-02

Civil/Structural Permit

Contact LGU
NBC Form A-03

Electrical Permit

Contact LGU
NBC Form A-04

Mechanical Permit

Contact LGU
NBC Form A-06

Plumbing/Sanitary Permit

Contact LGU
NBC Form A-07

Electronics Permit

Contact LGU

III. Accessory/Supplementary Permits

Fencing Permit

For fences over 1.80m (notarized)

Contact LGU
Demolition Permit

For structure demolition (notarized)

Contact LGU
Excavation Permit

For excavation work

Contact LGU
Sign/Billboard Permit

For signs and billboards

Contact LGU

IV. Completion & Occupancy Forms

Certificate of Completion

Issued by supervising professional

Contact LGU
Certificate of Occupancy

Application for occupancy permit

Contact LGU

V. Supporting Documents & Affidavits

Affidavit of Undertaking

Owner's sworn commitment (notarized)

Contact LGU
Owner's Consent

For non-owner applicants (notarized)

Contact LGU
Authorization Letter

Authorize representative

Contact LGU

VI. Fire Safety Forms

FSEC Application

Fire Safety Evaluation Clearance

BFP Office
FSCR Template

Fire Safety Compliance Report

BFP Office
How to Obtain Forms
Available Now:
  • NBC Form B-01 (Unified Building Permit) - Download above
To Obtain Other Forms:
  • Visit your local Office of the Building Official (OBO)
  • Check your LGU website's download section
  • DPWH NBC website: dpwh.gov.ph/dpwh/nbc
Quick Reference: Required Forms by Project Type
Basic Residential (Simple):
  • NBC Form B-01
  • NBC Form A-01 (Architectural)
  • NBC Form A-02 (Structural)
  • NBC Form A-03 (Electrical)
  • NBC Form A-06 (Plumbing)
  • Barangay & Zoning Clearance
  • Affidavit of Undertaking
Commercial Building (Complex):
  • All forms for residential, plus:
  • NBC Form A-04 (Mechanical)
  • NBC Form A-07 (Electronics, if applicable)
  • FSEC/FSCR (Fire Safety)
  • Environmental Compliance (if required)
Forms Inventory

Total Forms: 25+ | Available: 1 | See FORMS_INVENTORY.txt for complete list

Digital Archive - Building Plans & Permits

Search and manage building permit records and uploaded floor plans

0
Total Permits
0
Approved
0
Pending
0
Documents
Upload Building Plan (PDF)
Supported Plans: Architectural, Structural, Electrical, Plumbing, Mechanical Plans
Max Size: 10MB | Format: PDF only
Search Archive
to
Search Results
0 records
App. Number Owner Name TIN Property Address Submission Date Status Documents Actions

Use the search filters above to find building permit records

© 2025 BPSonline - Complete Building Permit System | v2.0.0

Philippine National Building Code (PD 1096) Compliant | All-in-One Integrated Solution